Innovative Bahnbau GmbH

Osnabrück Hbf – switch pre-assembly

Switch pre-assembly and track-area work at Osnabrück main station. Preparing components as part of the wider construction sequence.

Switch work in a station environment.

Innovative Bahnbau carried out switch pre-assembly work at Osnabrück main station. The project illustrates work on track components within a station environment. The photograph shows prepared sleepers and the work area alongside existing tracks.

Preparation as a distinct task.

Pre-assembly prepares components for subsequent assembly and installation. Work-area arrangements, material provision and the sequence of tasks form important interfaces in the wider construction process. Our contribution to this assignment was in switch pre-assembly.

Discuss a similar assignment.

Our track and switch construction page explains the related service area. For an enquiry about comparable work, drawings, a description of the assembly scope and the proposed period provide a useful starting point.

Osnabrück Hauptbahnhof

Discuss your project.

Send the location, task description and proposed period. We will discuss the next steps with you.

Get in touch ↗

← Back to overview

Osnabrück Hbf – switch pre-assembly | Innovative Bahnbau GmbH